Supply Chain Management · InteliView

Harvest to Cool

One clock per load, from the first cut to the start of cooling. A digital load ticket replaces the paper tag in the field, one scan at the cooler links it to every pallet, and a live countdown shows the floor what has to go in next.

Schedule a demo

Cut-to-cool for leafy greens, pick-to-cool for fruit · Nothing installed in the field · No new sensors at the cooler

Harvest to Cool = Field to Receive Digital Load Ticket · the field and the road + Receive to Cool Live countdown · the cooler floor
One load, start to finish
  1. 07:12 Start load
  2. 08:41 Create ticket
  3. 08:55 Leaves block
  4. 10:01 Arrives
  5. 10:06 Load ID on receipt
  6. 10:08 Pallet received
2 h 56 min
field to receive for the first pallet, confidence Measured
Field dwell 89 min Transit 80 min Dock wait 7 min

From 10:08 the pallet is on the cooler floor and Receive to Cool counts down to its cooling target. One timeline, every segment measured.

The problem

Product data starts too late today

Pallet barcodes are created at cooler receive, almost never in the field, so harvest time, block, crew and field conditions are lost or stay on paper. And once the pallet exists, the wait on the floor before cooling usually goes unmeasured too.

Harvest Paper tag, times often skipped
Transit No record
Cooler receive The WMS creates the pallet barcode
Pre-cooling The cycle is timed; the wait before it is not
No identity or timing before the pallet barcode

The wait before the cooler is where the target is lost.

Shelf life starts shrinking the moment produce is cut, and pre-cooling is what stops it. Measured at a pilot cooling site, before any countdown was on the floor:

1 in 5
pallets waited over three hours for their cooling to start
95 min
median wait from receive to the start of cooling
5½ h
the slowest tenth of pallets waited longer than this

Two production days at a pilot cooling site: 2,294 pallets with a real receive time.

Stage 1 · Field to Receive In design

Three taps in the field, one scan at the cooler

Only the crew leader's phone goes to the field. The Digital Load Ticket is made offline, travels with the load as a signed QR code, and is scanned once at receive. Everything after that is a step your cooler already does.

  1. Field

    Pick the block

    Today's assignments are prefilled, and the block is suggested from the phone's GPS.

  2. Field

    Harvest

    An elapsed timer and an optional +1 counter per pallet or bin. Time and location are recorded automatically.

  3. Field

    Close the load

    Review the count and the harvest window before the ticket is created. Any edit to a time needs a reason.

  4. Field → road

    Share the load ticket

    A signed QR code with a short load ID, shared to the driver's phone. A printed label only where no device can carry it.

  5. Cooler

    Scan at receive

    InteliView checks the signature and shows time since harvest, then prompts the one scan of the load ID into the WMS receipt.

  6. Cooler

    No WMS? Receive mode

    Scan the load QR, then scan or print pallet tags. InteliView creates the pallet records from the ticket, each linked to its load.

What the ticket carries
  • Load ID
  • Grower, ranch, block
  • Commodity and pack style
  • Crew and crew leader
  • Harvest start and end
  • Pallet or bin count
  • GPS
  • Sensor tag IDs, if used
  • Signature

The cooler sees every load before it arrives

When the phone has coverage, each tap syncs as it happens; offline taps back-fill with their original times. The inbound board shows what is being cut, what is on the road, and what is due by the hour.

Inbound loads Live · updated 09:41 Expected 11:00–12:00 26 pallets · 3 loads
6
Harvesting
3
Ready to ship
4
In transit
2
Arrived
38
Received today
Load Block Commodity Units State Since harvest Field conditions
DLT-7F3K BLK-4B Romaine 12 plt In transit 1h 24m 78°F · RH 41% · Heat exposure: high
DLT-8A2C BLK-7A Celery 9 bins Harvesting 0h 42m 76°F · RH 44%
DLT-5K9P BLK-2C Broccoli 14 plt Ready to ship 1h 05m 77°F · RH 42%
DLT-3M7Q BLK-9D Spinach 20 bins Arrived 2h 10m Pulp 71°F at close
DLT-1R4T BLK-4B Romaine 12 plt Received 2h 48m Linked · 12 of 12 pallets
The inbound board. Example data.
  • Weather by block GPS and a heat-exposure flag, with no field hardware.
  • Expected arrivals by hour, so the cooler can plan tubes, tunnels and crews ahead of the trucks.
  • Growers see only their own loads and their own scorecards.
  • Every field-to-receive time carries a confidence: Measured, Edited, Manual, Inferred or Incomplete. A load with no scan is matched on grower, ranch and time, and labelled Inferred.

Designed to replace paper, not add steps

No field infrastructure

Only the crew leader's phone goes to the field. Gateways, if used at all, sit at cooler receive.

Three taps, one scan

Start load, close load, create ticket. At receive, scan the load ID where the ticket number is typed today.

Offline first

The QR code carries the full record, so a dead signal never stops a load. Online mode adds live visibility.

Configuration, not integration

Uses InteliView's existing pull by pallet barcode and a per-customer field mapping.

Any operating model

Vertically integrated grower-shippers and separate grower and cooler companies use the same ticket and the same link at receive.

Clock checked

A network time check on every ticket, with the offset stored, so a phone on the wrong time zone cannot move a harvest.

Optional: sensor tags and truck beacons

A sensor tag on a pallet and a beacon on the truck add live product temperature from the field, automatic departure and arrival, and truck turn time at the dock. The app reads them in the field; gateways read them at the cooler. Tags go into a return bin for inspection and re-use. The core solution works without this layer.

Stage 2 · Receive to Cool

Every pallet on the clock, from the dock to the cooler

Receive to Cool times each pallet from the moment it is received to the moment its cooling starts. It counts down to your target and shows the floor what has to go in next, before product breaches. A monitoring add-on to InteliCool, with no new sensors.

Live Countdown Live · refreshes every 30 s Current time 16:17:03 Target 3:00:00
29 pallets
Received today
5 pallets
Active
2 pallets
Overdue · past 3:00
24 pallets
Completed today
06:04:04
Oldest floor time
Floor Time Pallet Barcode Product Receive Time Cooled Time RTC
06:04:04 44170218 Celery 30 ct 10:12:59 — −03:04:04
04:23:10 44170589 Cilantro 30 ct 11:53:53 — −01:23:10
02:41:02 44170953 Red Cabbage 18 ct 13:36:01 — 00:18:58
01:12:44 44171174 Romaine 24 ct 15:04:19 — 01:47:16
00:09:50 44171228 Green Onions 48 ct 16:07:13 — 02:50:10
Completed — cooling started
— 44171181 Broccoli Crowns 20 lb 15:05:20 16:09:40 01:04:20 Met
The Live Countdown, longest on the floor first. Example data.

How the countdown works

On time · RTC counts down from 3:00 Amber · 30 minutes left Red · RTC goes negative

Cooling starts at 1:30 → the pallet moves to Completed, target met.

  1. Receive

    Each pallet is timed from its receive time, taken from your WMS feed. Receipts without a real time are flagged and counted, never shown as on time.

  2. Count down

    Floor Time counts up from the receive. RTC counts down from your target, 3:00 by default and set per site. It turns amber with 30 minutes left and red, and negative, once the target passes.

  3. Cool and record

    The moment cooling starts, from a tube or tunnel sensor or an operator's app entry, the pallet moves to Completed with its final time, recorded against the target in force that day.

Every cooling method on one clock
Vacuum tube sensor cycle
Forced-air tunnel sensor cycle
Liquid ice mobile app entry
Water shower mobile app entry
On the cooler floor

Six views. One clock.

Every view reads the same calculation, made once on the server, so the floor TV, the report and the alert always show the same number at the same moment.

Live Countdown

Every pallet received today, longest on the floor first. Active pallets count down; completed ones show their final receive-to-cool time.

On-Floor

What is waiting right now: pallets not yet cooling, with cooling method and floor time, so the crew knows what goes in next.

Completed

Each pallet's receive-to-cool and cycle time, temperatures in and out, met or missed. Filter by date, method and commodity.

Received vs Estimate

What has arrived against what was expected, lot by lot and in cases, so the gaps in the day's supply are visible early.

Summary

The day on one screen: receiving against estimate, pallets by cooling method, cool status and timing, by site.

Lag Time

How long each tube, ice injector and shower sat idle between cycles, to tell a capacity problem from a throughput one.

Fit

Built for the floor, on the systems you already run

Built for the cooler floor

  • Floor-TV kiosk. Full screen and unattended, refreshing every 30 seconds, with no paging and the status strip always in view.
  • Alerts that reach the right person. Email when a pallet passes its target, a text if cooling still hasn't started, then an escalation contact. Once per breach, only in the hours you cover.
  • Phone and tablet layouts for the board on the floor, and Field mode for the crew leader.
  • English and Spanish on every screen.

Works with what you already run

  • InteliCool sensor cycles time vacuum tubes and forced-air tunnels automatically.
  • The InteliView mobile app captures cool start, cool end and temperatures for liquid ice and water showers.
  • Your WMS carries the load ID on the receipt and the receive time on every pallet, filtered to the warehouses this site actually cools.
  • No WMS, or product outside it? InteliView receive mode creates the pallet records from the ticket.

One calculation

Times are worked out on the server, never on the screen, so every device agrees.

Site time

Days and clocks follow the site's time zone, never a phone's or a server's.

Nothing hidden

Pallets without a usable receive time are counted and shown, not left out.

Every value labelled

Each field-to-receive time carries its confidence, from Measured to Inferred.

History that holds

Each result keeps the target that applied that day, so a later change rewrites nothing.

Own loads only

Growers delivering to a cooler see their own loads and scorecards, nothing else.

Rollout

Each stage rolls out in three phases

Every phase ends at a working go-live, so value reaches the floor first and the record builds from there.

Receive to Cool
1

See the floor

Live Countdown, On-Floor, the status strip, the floor-TV kiosk and overdue alerts.

2

Keep the record

Completed history, received against estimate, export to Excel and PDF, alert escalation.

3

Improve the day

Summary and Lag Time analytics, and the Spanish interface.

Field to Receive In design
1

Load ticket and receive link

Field mode, the offline QR ticket, the link at receive, live sync and the inbound board.

2

Extend

Provisional pallets and merge, grower scorecards, adoption metrics and the paper fallback.

3

Sensors and gateways

In-app tag and beacon reads, gateway downloads at the dock, departure, turn time and heat load.

See your own loads on the clock

We'll walk through Harvest to Cool on your operation's data: the field, the road and the floor.

Schedule a demo